In Progress
Tideline Housing
Fifty-two affordable homes on a tidal harbour edge, organised around a raised communal deck that doubles as flood defence.
Sector
Residential
Client
Institutional
Location
Bristol, UK
Area
6,700 m²
Year
2025
Status
In Progress

01 — Context
A social housing commission on a flood-risk harbour site requiring resilience and genuine community amenity in equal measure.

Fig. 02 — Interior study
02 — Concept
Homes are lifted onto a shared podium deck that performs as landscape, meeting space, and defensive datum against the tide.
Drawing — General arrangement plan
03 — Materials
Buff brick, galvanised balconies, and a hardwood communal deck.

Fig. 03 — Material detail
04 — Outcomes
On site, targeting net-zero-regulated operational carbon across all fifty-two homes.